Net Metering

Net Metering & LESCO Filing

LESCO Net Metering Service Shahdara Lahore

LESCO Net Metering: Zero Your Electricity Bill

Net metering allows grid-tied solar system owners in Lahore, Shahdara, and Ferozewala to export surplus solar energy back into the LESCO power grid. At SG Solar Solutions, we manage the complete turnkey LESCO licensing, technical documentation, inspection, and bi-directional green meter installation process.

Complete Turnkey Net Metering Process

Our team removes the bureaucratic hassle of dealing with LESCO subdivisions by handling all filing steps end-to-end:

LESCO Application Filing

Preparing CNIC validation, LESCO load assessment, and application submission to local subdivision offices.

Engineering Diagrams & NOC

Designing certified single-line diagrams, protection schematics, and equipment compliance certificates.

Bi-Directional Green Meter

Coordination for LESCO meter testing lab inspection and fast-track bi-directional meter replacement.

Tariff Conversion & Credits

Ensuring your monthly LESCO bill reflects solar units exported against peak grid tariff units consumed.

Net Metering FAQ

Frequently Asked Questions

What documents are needed for LESCO net metering?
You need a copy of your CNIC, latest paid LESCO electricity bill, property ownership proof, and a system single-line diagram. Our team prepares all technical documentation for you.
How long does the LESCO net metering process take?
The entire application, technical audit, and bi-directional meter installation process typically takes 4 to 6 weeks. We manage all LESCO coordination on your behalf.
What is the minimum system size required for net metering?
LESCO requires a minimum 3kW system with a 3-phase electricity connection to qualify for bi-directional net metering export.
Can net metering really make my LESCO bill zero?
Yes, by exporting excess solar units generated during the day to the LESCO grid, you earn energy credits that offset your nighttime grid electricity consumption.
Is there an extra fee for the green bi-directional meter?
LESCO charges a standard meter fee (approx PKR 25,000–35,000) for testing, supply, and installation of the official bi-directional green meter.

Start Your Net Metering Application Today

Let us handle all LESCO paperwork and get your system exporting power within weeks.